Meetings and milestones

Topics discussed in a meeting and written down in a report, presentations given in a meeting and any other information that comes from a meeting, as well as an overview of meetings and milestones are presented here.

Related information

DateDescriptionDocument
2 Oktober 2008Feedback moment before start fase 3 presentation. Presentation Karsten: 2008-10-02 PROTIDE - klanbordgroep - start fase 3.pps
2 Oktober 2008Feedback moment KBG 3 (klankbordgroep). Presentation Ernst:Protide_kbg3.pps
18 June 2008Full documentation on the website in PDF20080618 protide website extract.pdf
26 June 2007Documentation user oriented feasibility studyStrategisch en technisch ontwerp Protide.pdf
26 June 2007Final presentation user oriented feasibility studyCharta - Protide eindpresentatie.pps
16 April 2007First feedback moment presentationCharta - Protide.pps

An overview of meetings and milestones

DateType of meeting
2 October 2008Feedback moment to explain calculation method and discuss plans to go from prototype to production
16 September 2008Adapted documentation to last release + new release with bug fixes
22 August 2008New release: absolute UKC, varying criteria over the channel, tree structure for a channel, new version OCTOPUS, reduced effect of current and motion within the harbour and stabilized the use of figures on the website.
10 June 2008New release: bug fixes
2 June 2008New release: full prototype with vertical motion calculation, different possible channels, bottom touch probability calculation (based on channel depth, ship draught, ship type, estimated water level, heading, wave height, wave spectrum, wave direction, etc)
27 March 2008New release: performance increase (10.000 keel clearance calculations per second), introduced variance of forecasts in calculation, uses 95% percentile on resulting UKC distribution
19 March 2008Discussion recent data delivery and first (usable) motion application release
8 February 2008First calculation method released
19 November 2007OCTOPUS presentation Amarcon
30 October 2007Data request at HMCN
10 October 2007Workshop at Marin
10 October 2007Kick-off calculation method study
26 June 2007Final presentation user oriented feasibility study
25 May 2007User feedback moment
16 April 2007User feedback moment
26 January 2007Kick-off user oriented feasibility study